Home · Markets · Sourcing

Sourcing · September 2026 · 8 minute read

Importing handcrafted mattresses from China: what to check before you commit

The short answer: six things decide whether an import goes well — whether you are buying from a factory or a middleman, whether the construction sheet is frozen as a contract, which Incoterm you buy on, whether freight is priced on volume rather than weight, whether the packing is right for a bed that must not be compressed, and whether the compliance documents are in the right party's name. Price is the seventh question, not the first.

This is written by a Chinese mattress manufacturer, which means it is not neutral about the conclusion. But it is honest about the checklist, because a buyer who runs these questions gets a better outcome from us — or from whoever else they choose.

1. Factory or trading company?

Both exist, both can be legitimate, and the difference matters most when something goes wrong. A trading company that cannot control the construction cannot fix a construction problem; it can only relay messages.

Questions that sort this out quickly:

2. The construction sheet is the product

A mattress quote that lists a name and a price is not a specification. What you need, and what should become an annexe to the purchase contract, is a construction sheet that states:

Freeze it. Construction drift — the same model arriving with a cheaper ticking or a lighter filling in month six — is one of the most common failures in an import programme, and it is very hard to argue about without a written specification.

3. Sample first, and sign it off

Order a pre-production sample or a full swatch set before you commit to a container. Then do two things that buyers frequently skip:

  1. Compare the sample against the construction sheet line by line, not just by feel.
  2. Record its weight. Weight is the fastest way to detect a filling change later — if container two is materially lighter than the sample, something has been substituted.

4. Incoterms: what you are actually buying

TermWhere your risk startsWhen it makes sense
EXWAt the factory gateRarely. You take on inland haulage, export clearance and loading, which is usually worse value than FOB.
FOBWhen the goods are on board at the origin portThe most transparent option for a first order. You choose the forwarder and you see the real freight cost.
CIFAt the destination port, freight and insurance paidConvenient when the factory has better rates on your lane — but ask for the freight component to be broken out so you can compare.
DDPAt your delivery address, duty paidOnly where the supplier genuinely understands the destination's duty position and compliance regime. On a regulated product, that is a demanding condition, and an under-informed DDP quote can be an unpleasant surprise at customs.

For mattresses specifically, the packing plan and the Incoterm have to be decided together. Freight for this product is driven by volume, so the packing method is effectively part of the price.

5. Freight is a volume problem, not a weight problem

A mattress is large and light. A container of beds runs out of cubic space long before it approaches its payload limit, which means you are paying for air unless the packing is engineered.

The three usual options, and the honest trade-off between them:

Packing methodEffectCaveat
Machine compression, roll-packed and vacuum-sealedLarge reduction in volume; loading can multiply several times overOnly valid for constructions that survive compression. It destroys hand-tufted horsehair, and a sealed natural-filled bed can arrive with condensation inside.
Hand roll and strappedModerate volume reductionSeal consistency is poor; moisture risk on a long sea route is high.
Flat on palletsLeast volume savedThe correct choice for hand-built beds with natural fillings. Damage risk is lowest and the bed arrives as made.

Insist on a packing plan before you book freight: pallet dimensions, units per pallet, stack height, total pallet count and container loading. A supplier who cannot produce this is asking you to absorb their logistics risk. And confirm the wood packaging will be ISPM 15 heat-treated or fumigated with IPPC marks — untreated pallets are a routine cause of stopped, fumigated or returned containers.

The question worth asking every time. "What does the cheap packing option do to the life of the bed?" If the answer is vague, the saving is being financed out of your customer's warranty.

6. Compliance: whose name is on it

This is where imports fail most expensively, and the mistake is usually about responsibility rather than product quality.

Fire safety and product safety regimes generally attach to the party placing the goods on the destination market — not to the factory. In the UK, for example, the fire regulations control goods supplied in the UK and exclude goods manufactured for export, so the duty sits with the importer or retailer, supported by the evidence the manufacturer supplies.

So agree in writing, before the order:

For the detail on the UK regime specifically, see our guide to BS 7177.

7. Your label, your design, your property

If you are buying own-label or OEM, settle the intellectual property before production starts rather than after:

8. Payment, inspection and the first container

The mistakes we see most often

  1. Buying on unit price alone, with no packing plan and no freight estimate, then discovering the landed cost is materially higher.
  2. No frozen construction sheet, so a substitution six months later cannot be proved.
  3. Roll-compressing a bed that should not be compressed, to save space, and paying for it in returns and warranty.
  4. Assuming the factory carries product compliance, when the legal duty sits with the importer.
  5. Untreated pallets, and a stopped container at the destination.
  6. No sample, or a sample that was approved by feel and never compared with the specification.

Questions we get asked

What is your minimum order?

It depends on the model, the packing plan and whether the freight is shared with another project, so we do not publish a floor we invented. Tell us the model mix and the destination and we will tell you the smallest quantity that makes commercial sense.

What is the lead time?

Hand-built beds are made to order rather than pulled from stock, so your quotation states a production slot and a shipping window, and we confirm both against the batch before you commit. We would rather give you a date we hold to than a date we borrowed from a brochure.

Can you make our own model from our drawings?

Yes — that is what a construction sheet is for. Send the specification or the drawings, and we will return a construction sheet, a sample plan and pricing.

Do you work with our nominated forwarder?

Yes. On FOB terms we deliver to your forwarder at the origin port and hand over the document set, which is usually the cleanest arrangement for a first shipment.

Will you tell us if our specification will not work?

We will. The two cases that come up most are a construction that cannot reach the fire category the buyer needs without changing the feel, and a request to compress a bed that must not be compressed. Both are better discussed before the order than after.

About us

KÖPINGTOWN is a Chinese manufacturer of handcrafted mattresses — black horsehair, Australian wool, camel hair, pure cotton and jute felt over sewn calico pocket springs, closed with hand tufting and two rows of hand side-stitching. We build for luxury bedding brands, retailers, interior designers, villa and yacht projects and hotel contract programmes. We ship flat on treated pallets with a packing plan, we document every layer we use, and we will send you the construction sheet before you ask twice.

Request construction sheets & trade pricing See the collection

Scope note. This article reflects general trade practice in mattress sourcing and is written for commercial buyers. Duty rates, conformity schemes and documentation requirements vary by destination and change frequently — confirm the current position for your market with your own customs broker and compliance adviser before committing to an order.

Next

Related reading

BS 7177 explained for importers · Hotel procurement checklist · The UK programme